Find this useful? Take our survey

12 resources found. Showing most recently updated.

Covid- 19 Safety Precautions at JSEP and SKEP Constr...

During the Covid Pandemic, the engineers at USAID-Funded schools projects take the right safety measurements to mitigate its effect and the Covid transmission in the projects' sites.

  • Issued on 2021.
  • Uploaded over 1 year ago
  • Last updated over 1 year ago
  • CMTO/Trigon ()

Health and Safety Tip - Excavations near existing st...

This is a health and safety tip about the right engineering method to do excavations at construction sites near existing buildings. These types of excavations are dangerous and can result in serio...

  • Issued on 2021.
  • Uploaded over 1 year ago
  • Last updated over 1 year ago
  • CMTO/Trigon ()

Success Story - Employment of Female Graduate Engine...

USAID has funded a fresh graduate engineer program as part of the overall school construction program. As a result, 90 graduates were able to join the workforce through this program.

  • Issued on 2021.
  • Uploaded over 1 year ago
  • Last updated over 1 year ago
  • CMTO/Trigon ()

Design and Construction Standards

The document pertains only to that portion from the connection at the distribution main between the main stop and curb stop, for services 50 mm and smaller. EPCOR is not responsible for ownership o...

Green Building Situation in Jordan

Green Building Situation in Jordan can be characterized by the following:
 High proportion of engineers in Jordan.
 Energy and water are in short supply.
 Implementation of existing Jordanian...

Training program For installing and maintaining SWH ...

The South Company for Construction and Development (SCCD) is a privately held company, wholly owned by the King Abdullah II Fund for Development (KAFD), mandated by His Majesty to develop the South...

School construction III project, USAID/Jordan project

PACR of a project (9/85-6/92) to help the Government of Jordan (GOJ) construct and equip compulsory level (Grades 1-10) schools throughout Jordan. The project succeeded in constructing, furnishing,...

Project assistance completion report and completion ...

USAID contributed dollars $6.7 million in grant funds with
the Government of Jordan's (GOJ) dollars $6.547 million for
Schools Construction II project. This joint USAID/GOJ effort
was designed t...

Iribd Chamber of Industry Strategic Management Plan

This main objective of this assignment is to carry out the main recommendations of the
assessment conducted earlier by SABEQ which was working on developing the Chamber’s
institutional structure ...

Sector Differentiation for CBJ Reporting

CBJ collects information from the banks in Jordan on credit facilities extended according to the sectors and by type of borrower

No collections found with that combination

Let Us Know What We're Missing

Didn't find what you were looking for? Take our survey and let us know what you would like to see on the KaMP

Take the survey