Resource
-
LanguageEnglish
-
Resource TypePDF
-
Uploaded By
-
Date Added2016-02-21
-
Corporate AuthorshipMinistry of Water and Irrigation ; Water Authority
-
Related Resources
- WES - Success Story "International Women's Day" - 2022
- WES- Success Story
- End of Project Evaluation of the Institutional Support and Strengthening Program (ISSP) 2013
- Energy Efficiency and Renewable Energy Policy 2015
- The Assessment of the Effects of Privatization and Regulation of the Water Sector in Jordan
Preparatory Works Technical Report
Preparatory_Works_Technical_Report.pdf
http://www.mca-jordan.gov.jo/SystemFiles/Pages/file_635040879365421406.pdf
This is the technical report produced as part of a Feasibility Study, Environmental and Social Impact Assessment and Detailed Designs and Bidding Documents for the Zarqa Governorate Wastewater System Reinforcement and Expansion Project. The study is divided into two stages: First stage of the study includes preparatory studies that are required to define an investment programme; preliminary environmental and social assessment; preliminary designs; and the assessment of feasibility of the investment program, including economic analysis. Second stage is the preparation of an EIA, detailed design and contract documents; and is dependent upon the successful completion of Stage. The report was published in 2010.